A two-sided portal. Your contractors log in to bid against your RFQs, see their work orders, view transmitted drawings, request inspection, submit work-done, upload bills, update bank details. Your back office sees everything land in the same screens they already use — no parallel inbox, no email forwarding, no re-entry.

§ 01
Two sides
One portal · two audiences · five stations

What contractors do.
What we see.

Every step the contractor takes on the portal becomes a record in the back office. No copy-pasting. No email chase. The journey below is the same five-station flow viewed from both sides at once — contractor's actions above the line, your team's view below.
▸ FIVE-STATION FLOW · CONTRACTOR ACTIONS ABOVE · BACK-OFFICE BELOW ▸ CONTRACTOR LOGS IN 1 Quote ▴ submits Tender Quotation vendor onboarded · RFQ visible ▾ price comparison auto-runs L1/L2/L3 ranked instantly 2 Win ▴ View Order · accepts terms drawings tab unlocks ▾ Work Order generated terms locked · BG track-on 3 Execute ▴ requests inspection · submits Work Done drawings · RFI · daily progress ▾ inspection routes to billing engineer QC + DPR validate 4 Bill ▴ uploads via Bill Inward PDF · invoice + supporting docs ▾ AI Scan extracts · RA Bill drafts approval queue · auto-routed 5 Paid ▴ sees status · Vendor Bank update payment notification · self-service ▾ payment posted · ledger closed retention deducted · tracked ▾ BACK OFFICE SEES ▸ EVERY STEP TIMESTAMPED · APPROVAL TIME TAKEN REGISTER · COMPLETE AUDIT TRAIL
§ 02
The pillars
Three deep-dives · what the contractor actually does

Quote. Execute. Bill.

Each pillar below is one phase of what the contractor does on the portal. The illustration shows what they see; the text explains what your back office sees. Six menu items split across three pillars.
Pillar · 01 · Quote

Tender Quotation + amendment · online.

You publish an RFQ. The portal pings every onboarded vendor. They log in, see the BOQ, fill quoted rates against each line, attach their commercial terms, click submit. You see the quote land instantly — and the price comparison auto-runs across all bidders the moment the RFQ closes. If they need to revise, Quotation Amendment carries the audit trail.

Vendor OnboardingSelf-serve · KYC docs · BG · GST/TRN
Tender QuotationPer-BOQ-line pricing · attachments · sealed until close
Quotation AmendmentVersioned · audit-trailed · L1 re-evaluated
L1 rankingAuto-run on RFQ close · price + technical
RFQ-1042 · CIVIL FRAME · TOWER B closes 18 Apr · 4 line items · seal-until-close QUOTED RATES · VENDOR SIDE M30 · slab + column 6,800 cum · M30 grade ₹ 6,180 Reinforcement · TMT 380 MT · Fe-500 ₹ 64,200 Shuttering · per sqm 12,400 sqm · ply + steel ₹ 380 Labour · per cum all-in skilled + unskilled ₹ 1,850 Total quote value ₹ 38.4 Cr ▸ Submitted · 14 Apr 11:22 IST sealed · visible to back office on 18 Apr close ▸ ON RFQ CLOSE · BACK OFFICE SEES Price comparison · 4 vendors vendor B · ₹ 38.4 Cr · L1 ✓ vendor A ₹ 39.8 · vendor C ₹ 41.2 · vendor D · DQ
Pillar · 02 · Execute

View Order · drawings · RFI · Work Done.

Once they win, the order shows up in their portal — every line, every term, every drawing transmitted to them. They request inspection when an activity is ready. They submit Work Done — quantity executed, dates, location. Your billing engineer's screen lights up with each submission, ready for the certification chain (DPR, QC, sign-off).

View Order · order bookActive WOs · terms · BG · retention status
Drawings accessAll transmitted drawings · current version only
Request for Inspection (RFI)Online · routes to billing engineer · scheduled
Work Done submissionPer-activity · qty · evidence · certification queue
VENDOR DASHBOARD · CONTRACTOR PORTAL WO-088 · Civil frame · Tower B · ₹ 38.4 Cr drawings: 88 transmitted · RA bills: 4 · BG active DRAWINGS · TRANSMITTED TO YOU A-201 · 5F plan v3 received 14 Apr ✓ S-110 · slab v2 received 12 Apr ✓ REQUEST FOR INSPECTION RFI · slab F5 · ready for inspection ▸ submitted · billing engineer scheduled 16 Apr WORK DONE · SUBMITTED Slab F5 · concreting 2,840 cum CERT'D ✓ Column F5-F6 1,920 cum CERT'D ✓ Beam F5 1,640 cum REVIEW ▸ EVERY SUBMISSION ROUTES TO BILLING ENGINEER 3-step certification · DPR + QC + qty signed off
Pillar · 03 · Bill

Bill Inward · approval · payment status.

Once work-done is certified, the contractor uploads their bill via Bill Inward — PDF, supporting docs, GST/TRN-compliant. Your back office sees it land in the AR queue with the certified work-done already linked, retention pre-deducted, escalation pre-applied. The contractor sees status updates as the bill moves through approval, all the way to payment hitting their account. Vendor Bank Update lets them maintain payment details themselves.

Bill InwardPDF upload · invoice + supporting · GST/TRN-validated
Approval visibilityStatus at each stage · ageing visible
Vendor Bank UpdateSelf-service · maker-checker · audit-trailed
Payment notificationUTR · date · amount · auto-mailed
BILL INWARD · CONTRACTOR PORTAL ▴ Upload bill PDF + supporting drag-drop · GST/TRN auto-validated · multi-file YOUR BILLS · STATUS RA-Bill-04 · ₹ 5.59 Cr PAID · 12 Apr · UTR-7841 PAID ✓ RA-Bill-05 · ₹ 4.12 Cr approval queue · 3 of 4 signatures APPROVAL RA-Bill-06 · ₹ 3.84 Cr submitted · billing engineer reviewing REVIEW VENDOR BANK UPDATE · SELF-SERVICE HDFC · A/C ****4521 · IFSC HDFC0001234 last updated 8 Mar · maker-checker verified ▸ EDIT ▸ AVG BILL APPROVAL TIME · 4.2 DAYS visible to contractor · accountability both ways
§ 03
And separately…
A different tool · same back-office team uses it

Bills come in from many places.
AI Scan handles them all.

Not every contractor uses the portal. Some still send paper bills, some email PDFs, some couriers a stack of vouchers. Your back office shouldn't care which channel — they should just hit a button. AI Scan is the tool that does that. It's a separate sub-page because it's a separate audience: your back office, not your contractors.
▸ AI Scan · sub-page 05

Paper. PDF. Portal upload.
Same engine.

Upload a scanned bill, an emailed PDF, a portal-submitted file. AI Scan reads it, extracts header + line items, matches them to the work order, drafts the RA bill against the certified work-done, flags discrepancies. The back-office team reviews and approves — they don't re-key.

See AI Scan walkthrough
▸ 3 INPUT CHANNELS · 1 OUTPUT Paper bill scanned PDF email attached Portal upload contractor side AI Scan extract · match · draft ▾ DRAFT RA BILL structured · WO-linked · review-ready CHANNEL-AGNOSTIC · BACK-OFFICE TOOL · NOT PORTAL-DEPENDENT
§ 04
Related
Other Engineering sub-pages

Where to go next.

The portal is the contractor-facing surface. The other sub-pages cover the spine, the LMP rhythm, drawing management (which transmits drawings to the portal), AI Scan, and BIM Revit BOQ.
Before the portal, my procurement team's mailbox was the bottleneck. Vendors emailing quotes, calling for status, couriering bills. Now the portal is the inbox — and the inbox is the system. The thing I didn't expect: vendors prefer it. They can see exactly where their bill is, exactly when it'll be paid. Our supplier relationships got better.
— Procurement Head · Indian developer · 38 active towers
Next step

See both sides
of the portal.

30 minutes. We'll show your back office's view of an active RFQ, then jump into a contractor's login and walk the same RFQ from their side. Submit a quote. View an order. Request inspection. Upload a bill. Watch it land back in your queue without a single email.